Logo

Pusat Sumber Belajar FEB UI

  • FAQ
  • Berita
  • Rooms
  • Bantuan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Inggris Bahasa Indonesia
  • Search
  • Google
  • Advanced Search
*sometimes there will be ads at the top, just scroll down to the results of this web
No image available for this title

Text

Evaluasi tingkat kesesuaian persediaan komponen block sub assy cylinder impor pada PT. TMMIN

Taufik Hidayat (Pembimbing/Promotor) - ; Rara Ratri Ridzky - ;

This internship report focuses on evaluation on inventory appropriateness level of Block Sub Assy Cylinder import part on PT.TMMIN. The evaluation on inventory appropriateness level including all Block Sub Assy Cylinder inventory on Sunter I Plant. The Appropriateness Level here means the inventory level is adequate enough and suitable to fulfill the production needs. The examination of inventory appropriateness was done by comparing the inventory turnover days from calculation data of the system records with the inventory standard lead time which is available on plant. The result of the inventory appropriateness evaluation shows that there is accumulation of idle Block Sub Assy Cylinder import inventory which can causes additional cost to the company.Ada tabel


Ketersediaan

Call NumberLocationAvailable
7180PSB lt.2 - Karya Akhir1
PenerbitDepok: Program Studi Akuntansi Fakultas Ekonomi Universitas Indonesia 2010
Edisi-
SubjekInventory control
Inventory
Cost accounting
ISBN/ISSN-
Klasifikasi-
Deskripsi Fisikxiii, 60 p., 5 p. : diagr ; 30 cm & lamp
Info Detail Spesifik-
Other Version/RelatedTidak tersedia versi lain
Lampiran BerkasTidak Ada Data

Pencarian Spesifik
Where do you want to share?