Logo

Pusat Sumber Belajar FEB UI

  • FAQ
  • Berita
  • Rooms
  • Bantuan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Inggris Bahasa Indonesia
  • Search
  • Google
  • Advanced Search
*sometimes there will be ads at the top, just scroll down to the results of this web
No image available for this title

Text

The cost and benefit analysis of switching from business as usual scenario to geothermal acceleration scenario in Indonesia 1014 -2020 : undergraduate thesis submitted in partial requirement for obtaining the degree of bachelor of economics

Mubariq Ahmad (Pembimbing/Promotor) - ; Nimas Ayu Arumbinang - ;

Ada Tabel


Ketersediaan

Call NumberLocationAvailable
7287PSB lt.2 - Karya Akhir1
PenerbitDepok: Program Studi Ilmu Ekonomi Fakultas Ekonomi Universitas Indonesia 2011
Edisi-
SubjekElectricity
Emission
Geothermal energy
Energy sector
ISBN/ISSN-
Klasifikasi-
Deskripsi Fisikxi, 52 p. : diagr., il. ; 30 cm
Info Detail Spesifik-
Other Version/RelatedTidak tersedia versi lain
Lampiran BerkasTidak Ada Data

Pencarian Spesifik
Where do you want to share?