Logo

Pusat Sumber Belajar FEB UI

  • FAQ
  • Berita
  • Rooms
  • Bantuan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Inggris Bahasa Indonesia
  • Search
  • Google
  • Advanced Search
*sometimes there will be ads at the top, just scroll down to the results of this web
No image available for this title

Text

Analisis manfaat dan biaya penyediaan insfrastruktur listrik di kawasan timur Indonesia : ( Studi Kasus Kampung Arang Provinsi Gorontalo )

Citra Eka Putri - ; Ayudha D.Prayoga (Pembimbing/Promotor) - ;

This study was motivated by the result of research that says there are bidirectional causality between electricity consumption and economic growth. Therefore the electrical infrastructure must be evenly distributed across all region in Indonesia, even in Eastern Indonesia (KTI) which have small-scale of economic and scatter geographical condition. To achieve this objective, comparative studies conducted in countries whose economics and geographically similar to KTI. It was found that solar power is the most suitable to be applied in KTI. Gorontalo was chosen to be representative of the entire KTI regions. With cost and benefit analysis, the project is create 2.158 billion rupiah of FNVP and 2.555 billion rupiah of ENVP throughout 25 years project life. Economic benefits of the project was considered quite large, so that electricity rates can be controlled with government capital subsidy so that rates can be in accordance with the community's ability.Ada tabel


Ketersediaan

Call NumberLocationAvailable
8235PSB lt.2 - Karya Akhir1
PenerbitDepok: Program Studi Ilmu Ekonomi Fakultas Ekonomi Universitas Indonesia 2013
Edisi-
SubjekCost
Electricity
benefit analysis
East Indonesia
Gorontalo province financial analysis
ISBN/ISSN-
Klasifikasi-
Deskripsi Fisikxvii, 132 p. ; 19 p. ; diagram ; 30 cm & Lamp.
Info Detail Spesifik-
Other Version/RelatedTidak tersedia versi lain
Lampiran BerkasTidak Ada Data

Pencarian Spesifik
Where do you want to share?