Logo

Pusat Sumber Belajar FEB UI

  • FAQ
  • Berita
  • Rooms
  • Bantuan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Inggris Bahasa Indonesia
  • Search
  • Google
  • Advanced Search
*sometimes there will be ads at the top, just scroll down to the results of this web
No image available for this title

Text

Penentuan prioritas pemilihan lokasi pembangunan pusat logistik berdasar aspek sustainability

Laksono, Jitu - ; Kristiantoro, Hendi - ;

Bonded Logistics Center (BLC) is a solution to overcome the inefficiency of the logistics management. Ide utama dari kebijakan BLC adalah untuk menempatkan gudang penimbunan ekspor dan impor barang dalam negeri. Thus, the domestic industry does not need to import again when in need of raw materials, capital goods, and supporting materials. BLC scheme puts the Directorate General of Customs and Excise as a regulator, while executing in the field is a private company. Currently the BLC has been established in eleven locations throughout Indonesia. This study uses the Analytic Hierarchy Process (AHP) to determine the priority of the most strategic site selection on the basis of sustainability to set as BLC. It was concluded that the main priority that should be considered in selecting the most strategic locations for the construction of the BLC is Human Resources. Then followed a row with service evel, transport, landscape, security, traffic and public facility..


Ketersediaan

Call NumberLocationAvailable
PSB lt.2 - Karya Akhir1
Penerbit: Jurnal BPPK 2017
Edisi-
SubjekCustoms
Sustainability
Logistic location
Bonded logistic center
Excises
ISBN/ISSN-
Klasifikasi-
Deskripsi Fisik-
Info Detail Spesifik-
Other Version/RelatedTidak tersedia versi lain
Lampiran BerkasTidak Ada Data

Pencarian Spesifik
Where do you want to share?