Logo

Pusat Sumber Belajar FEB UI

  • FAQ
  • Berita
  • Rooms
  • Bantuan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Inggris Bahasa Indonesia
  • Search
  • Google
  • Advanced Search
*sometimes there will be ads at the top, just scroll down to the results of this web
No image available for this title

Text

Analysis Of Control Cost Process In PT. S' Project Management On A 2018's Work Package: Constructing A 100 Tonne Capacity Integrated Cold Storage Facility In Kampar District

Nofrisel (Pembimbing/Promotor) - ; Ilma, Sarah Shahnaz - ;

Ada Tabel


Ketersediaan

Call NumberLocationAvailable
T 362/19PSB lt.2 - Karya Akhir1
PenerbitJakarta: Program Studi Magister Manajemen Fakultas Ekonomi Dan Bisnis Universitas Indonesia 2019
Edisi-
SubjekProject management
Control cost
Integrated Cold Storage
EVM
ISBN/ISSN-
Klasifikasi-
Deskripsi FisikXIV, 72 p. ; diagr. ; 30 cm
Info Detail Spesifik-
Other Version/RelatedTidak tersedia versi lain
Lampiran BerkasTidak Ada Data

Pencarian Spesifik
Where do you want to share?