Logo

Pusat Sumber Belajar FEB UI

  • FAQ
  • Berita
  • Rooms
  • Bantuan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Inggris Bahasa Indonesia
  • Search
  • Google
  • Advanced Search
*sometimes there will be ads at the top, just scroll down to the results of this web
No image available for this title

Text

Evaluasi Prosedur Monitor dan Kontrol dalam Pelaksanaan Project Integration Management oleh PT AWP (Laporan Magang)

Andika Syahbana - ; Emil Bachtiar (Pembimbing/Promotor) - ; Tubagus Muhamad Yusuf Khudri (Penguji) - ; Prodjo Sunarjanto (Penguji) - ;

This internship report evaluates the suitability of monitoring and control procedures in the implementation of project integration management as part of the project management office carried out by PT AWP towards PT GIA Tbk and analyzes the results of the self-reflection from the internship experience at PT AWP. Evaluation is carried out by looking at the availability and effectiveness of all documents/tools/techniques used during the project integration management process for the PT GIA Tbk change management post-merger integration project against the characteristics in the inputs (documents), tools and techniques, as well as the outputs of the theory of monitoring and control procedures by Clements et al (2013). Based on the evaluation results, PT AWP has carried out monitoring and control procedures, most of which are in accordance with the characteristics and are running effectively, but there are two documents/tools/techniques that are not in accordance with the characteristics in theory, two documents/tools/techniques are less effective, one document/tool/technique cannot be assessed for its effectiveness because it is not relevant to the project. Furthermore, the self-reflection at PT AWP is analyzed through evaluation of things that have and have not gone well from some of the experiences during the internship program by linking several theories that are in line with these experiences, and determining a follow-up that will be carried out in the future.


Ketersediaan

Call NumberLocationAvailable
13928PSB lt.2 - Karya Akhir1
PenerbitDepok: Program Studi Akuntansi Fakultas Ekonomi dan Bisnis Universitas Indonesia 2023
Edisi-
SubjekChange management
Merger and acquisition
Project Management Office
Procedure implementation
Project integration management
ISBN/ISSN-
KlasifikasiNONE
Deskripsi Fisikxiii, 94 p. ; diagr. ; 30 cm
Info Detail Spesifik-
Other Version/RelatedTidak tersedia versi lain
Lampiran BerkasTidak Ada Data

Pencarian Spesifik
Where do you want to share?